INTRODUCING THE GREENZONE® TERMITE MANAGEMENT FILM

SAVE TIME, MONEY, RESOURCES AND HASSLE ONSITE.

GREENZONE® Termite Management Film is a physical termite risk management measure that is flexible in nature and is classed as a chemical barrier in a non-soil matrix. It is a once only treatment that is designed to last the economical life of the building.

GREENZONE® Termite Management Film is installed to areas of the building where termites may ingress. The GREENZONE® Termite Management Film is designed to force out the undetected entry of termites where their earthen tunnels and galleries are readily detected. The onus is on the owner to be vigilant in maintaining a clear 75mm visual inspection zone (see maintenance and guidelines in section 11) in conjunction with regular competent inspections from a qualified

GREENZONE® accredited inspector not exceeding 12 months to comply with warranty terms and conditions.

This GREENZONE® training manual provides installation measures to deter termite ingress arising from concealed entry points into the building. The system also relies on a combination of partial measures combined with maintaining perimeter inspection zones so that the evidence of termite workings is forced out into the open where their presence may be detected more readily.

The GREENZONE® Termite Management Film works in conjunction with the concrete slab being poured to AS 2870-2011 which forms an integral part of the termite risk management measure by using the concrete slab as a physical barrier complying with AS 3660.1-2014

REGISTER YOUR INTEREST

THE BENEFITS OF THE GREENZONE TERMITE MANAGEMENT FILM

Easy to install

The GREENZONE® Termite Management Film can be installed at anytime after the concrete slab has been poured, but prior to the erection of the internal wall frames.

Durable single sheet film

Durable single sheet film with bifenrithin as the active ingredient, to protect against termite ingress.

Completes the Greenzone Termite management system

The GREENZONE® Termite Management Film works in conjunction with the concrete slab being poured to AS 2870-2011 which forms an integral part of the termite risk management measure by using the concrete slab as a physical barrier complying with AS 3660.1-2014

Installed before or after formwork

Being able to install this product before or after formwork makes for more flexible site scheduling and a cost effective process.